Andre's Agora
Home Up

 

  Phase 1: Fall 2002

07/09/07

Up
Phase 1: Fall 2002
Phase 2: End of 2002
Phase 3: March & April 2003
Phase 4: May & June 2003

 


 

Outside structure without a roof

Inside the flat, looking through the opening for the stairs

Upper floow with no walls for the rooms

Upper floor with arrival of stairs and no walls for rooms

Upper floor with south window

Upper floor with the ALBA bricks to build the walls for the rooms

Upper floor with the double windows on the high end

Upper floor now with the roof

Upper floor with roof and with arrival of stairs

Lower floor with opening for stairs

Lower floor with small wall for kitchen separation

Wall for kitchen separation

Living room

Lower floor with wall for kitchen separation and opening for stairs

Living room

Living room with Aileena, Rebecca and Elisabeth

Home | Phase 1: Fall 2002 | Phase 2: End of 2002 | Phase 3: March & April 2003 | Phase 4: May & June 2003

This site was last updated 05/14/05